How we organized the blog production

We created a dedicated project called VAR2 Blog — October 2026, assigned the brand kit, and moved in the first image, which had initially been created elsewhere. The project held the article illustrations, the shoe image, the forest variation, and the video.
We also kept attempts that were not selected so we could revisit the brief and understand the decision. Only selected assets were published on the website. For a client project, you can add a naming convention that distinguishes source files, variations, and approved results, and also keep the final version in an organized delivery folder.
From an existing result, you can move on to finishing tools or video. For a repeatable process, open the Workflows canvas.
Practical guide • Updated October 9, 2026
When a library holds hundreds of images, the problem is no longer how to create another one. It is finding the right version, understanding which prompt you used, and knowing what was approved. An organized project turns the library from a storage tool into part of your working process.
Create a project around an objective
Choose a unit of work you can explain in one sentence: “Blog — guide series,” “Product launch — October,” or “Winter campaign.” The project description should cover the audience, deliverables, and visual direction. A separate project for every small experiment scatters the context; a single project for the entire business becomes too crowded.
- Create a project with a name that includes its objective and time period, where relevant.
- Add a short description: what you are producing, for whom, and in which aspect ratios.
- Assign an appropriate Brand Kit and check that it is active before generating.
- Keep the source materials and relevant creations in the same project.
- If you accidentally generated an asset in another project, use the library’s organization actions to move it, then check the result in the destination project.
Separate creative names from working names
An automatic name may describe the image without explaining its purpose. Add an asset name, version, and status to your production tracker: for example, “MCP cover — version 03 — approved.” If the interface does not offer a suitable status field, maintain a simple approval list alongside the project; there is no need to treat every draft as a final deliverable.
What to record for every approved asset
- The brief and prompt that produced the result.
- The model and key settings, including aspect ratio.
- The reference images and brand kit you used.
- A link to the original asset and its exported version.
- What was checked and what needs fixing before further use.
Example: a series of ten blog images
Define a shared visual language: background, material, lighting, and color palette. Give each guide a different object that explains its subject. This creates a visual family without duplicating an image. Approve the first two images side by side before generating the rest, and check that they work both on a small card and as a cover image.
Once the direction is approved, you can generate more candidates with the same settings. Avoid changing the model, lighting, and palette all at once without a reason: it makes it hard to tell which change caused a deviation. At the end, group the selected results and download the assets you need to retain locally, in line with the storage policy.
Before wrapping up production
Make sure the project includes the approved assets, that the links open, and that the published versions match the versions you saved. Check your plan’s storage terms, and do not assume an experiment library is an independent backup of all your business assets.
To establish a shared visual language, see the Brand Kit guide; for recurring productions, see Workflows.
Frequently asked questions
Do I need a project for every experiment?
It is usually better to organize projects around a production objective: a campaign, a client, or a content series. Too many small projects scatter your sources and context.
What if a creation was saved in another project?
Use the library’s organization actions to move it to the intended project. After moving it, check that the asset appears in the correct gallery.

